Operations
Resources and Reserves
Alacer Gold - Proven and Probable Mineral Reserve Summary (As of December 31, 2018)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -   -   - 
Probable  6,253  1.10  6.18  0.11  222  1,242 15,685
Probable - Oxide Stockpile  121  0.58  -    -    2  -   - 
Proven + Probable  6,374  1.09  6.06  0.11  224  1,242 15,685
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -   -   - 
Probable  28,905  2.60 6.65  -    2,418  6,180  - 
Probable - Sulfide Stockpile  8,272  3.20  -    -    850  -   - 
Proven + Probable  37,177  2.73  5.17  -    3,268 6,180  - 
 Çakmaktepe
- Oxide
Proven  - 
 -    -    -    -    -    -  
Probable 2,468 2.18 14.47  -   173 1,148  -  
Probable - Oxide Stockpile 81 1.13  -    -    -    -  
Proven + Probable 2,549 2.15 14.01  -   176 1,148  -  
Ҫӧpler Project Total Proven  -   -    -    -    -   -   - 
Probable 46,100  2.47  5.78  0.02  3,667 8,570 15,685
Proven + Probable 46,100  2.47  5.78  0.02   3,667 8,570 15,685


Notes: Further information on this Mineral Reserve estimate is in the Çöpler Mine Technical Report and in the Çakmaktepe press release dated December 18, 2017 ("Çakmaktepe Update") which can both be found on be on our website, www.AlacerGold.com, www.sedar.com and on www.asx.com.au. Mineral Resources are quoted after mining depletion through December 31, 2018. Reserves were adjusted to exclude Gediktepe post the sale announcement on July 17, 2019. Mineral Reserves are shown on a 100% basis. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Çöpler Mine Technical Report and the Çakmaktepe Update.  The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences may occur.


Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of December 31, 2018)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000)
Ardich - Oxide Indicated 14,194 1.48  -  - 677  -  -
Inferred 7,351 1.70 - - 402 - -
Ardich - Sulfide Indicated 1,661 2.62 - - 140 - -
Inferred 1,468 4.06 - - 192 - -
Ardich Deposit Total Indicated 15,855 1.60 - - 817 - -
Inferred 8,819 2.09 - - 594 - -
Ҫӧpler Mine - Oxide Indicated  12,935 0.97  4.25  0.13   402 1,766 35,802
Indicated - Oxide Stockpile 121  0.58 - -  2  - -
Indicated 13,056  0.96  4.21  0.12  404 1,766 35,802
Inferred  18,976  0.86  6.99  0.14  522  4,265 58,562
Ҫӧpler Mine - Sulfide Indicated  61,162  2.10  5.54 -  4,124 10,894 -
Indicated - Sulfide Stockpile  8,272  3.20 - -  850 - -
Indicated  69,435  2.23  4.88 -  5,007 10,894  -
Inferred  12,716  1.99  12.02  -  814 4,913  -
 Ҫakmaktepe 
- Oxide
Indicated 3,749 1.87 12.37  - 226 1,491  -
Indicated- Oxide Stockpile  81 1.13  -  - - -
Indicated 3,830 1.86 12.11  - 229 1,491  -
Inferred 1,435 1.05 8.03  - 49  370 -
 Bayramdere 
- Oxide
Indicated 145 2.34 20.82 - 11 97 -
Indicated 145 2.34 20.82 - 11 97 -
Inferred 8 2.17 19.95 - 1 5 -
Ҫӧpler Project - Total Indicated  86,465  2.02  5.13  0.02  5,617 14,248 35,802
Indicated  86,465  2.03  5.13  0.02  5,651 14,248 35,802
Inferred  33,136  1.30  8.97  0.08  1,385 9,554 58,562
Alacer Gold - Total Indicated  102,320  1.96  4.33  0.02  6,434 14,248  35,802
Inferred  41,955  1.47  7.08  0.06  1,979  9,554 58,562


Notes: Further information on this Mineral Resource estimate is in the Çöpler Mine Technical Report, dated June 9, 2016; the Çakmaktepe press release, dated December 18, 2017 ("Çakmaktepe Update");and the Ardich press release dated November 22, 2019 ("Ardich Update") can all be found on our website, www.AlacerGold.com, www.sedar.com and on www.asx.com.au. Mineral Resources are quoted after mining depletion through December 31, 2018 and are inclusive of Mineral Reserves. Resources were adjusted to exclude Gediktepe post the sale on July 17, 2019. Mineral Resources are shown on a 100% basis. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Çöpler Mine Technical Report, the Çakmaktepe Update, and the Ardich Update.  The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences may occur.

Market Data copyright © 2019 QuoteMedia. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges). RT=Real-Time, EOD=End of Day, PD=Previous Day. Market Data powered by QuoteMedia. Terms of Use.