Operations
Resources and Reserves
Alacer Gold - Proven and Probable Mineral Reserve Summary (As of December 31, 2019)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -   -   - 
Probable  5,978  1.10  6.29  0.10   211  1,209 12,929
Probable - Oxide Stockpile  23  1.11  -    -    1  -   - 
Proven + Probable  6,001  1.10  6.27  0.10  212  1,209 12,929
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -   -   - 
Probable  28,359  2.60 6.70  -    2,373  6,106  - 
Probable - Sulfide Stockpile 6,868  2.75  -    -    608  -   - 
Proven + Probable  35,227  2.63  5.39  -    2,980 6,106  - 
 Çakmaktepe
- Oxide
Proven  - 
 -    -    -    -    -    -  
Probable 1,321 2.13 10.08  -   90 428  -  
Probable - Oxide Stockpile 11 2.69  -    -    -    -  
Proven + Probable 1,332 2.13 10.00  -   91 428  -  
Ҫӧpler Total Proven  -   -    -    -    -   -   - 
Probable 42,560  2.40  5.66   -    3,284 7,743 12,929
Proven + Probable 42,560  2.40  5.66   -     3,284 7,743 12,929

Notes: Further information on this Mineral Reserve estimate is in the Çöpler Mine Technical Report and in the Çakmaktepe press release dated December 18, 2017 ("Çakmaktepe Update") which can both be found on be on our website, www.AlacerGold.com, www.sedar.com and on www.asx.com.au. Mineral Resources are quoted after mining depletion through December 31, 2019. Mineral Reserves are shown on a 100% basis. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Çöpler Mine Technical Report and the Çakmaktepe Update.  The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences may occur.


Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of December 31, 2019)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000)
Ardich - Oxide Indicated 14,194 1.48  -  - 677  -  -
Inferred 7,351 1.70 - - 402 - -
Ardich - Sulfide Indicated 1,661 2.62 - - 140 - -
Inferred 1,468 4.06 - - 192 - -
Ardich Deposit Total Indicated 15,855 1.60 - - 817 - -
Inferred 8,819 2.09 - - 594 - -
Ҫӧpler Mine - Oxide Indicated  12,623 0.97  4.27  0.12  392 1,733 33,435
Indicated - Oxide Stockpile 23  1.11 - - 1  - -
Indicated 12,646  0.97  4.26  0.12  393 1,733 33,435
Inferred  18,737  0.85  7.01  0.14  514  4,220 57,341
Ҫӧpler Mine - Sulfide Indicated  60,296  2.09  5.57 -  4,051 10,789 -
Indicated - Sulfide Stockpile  6,868  2.75 - -  608 - -
Indicated  67,164  2.16  5.00 -  4,659 10,789  -
Inferred  12,554   1.99  12.00  -  804 4,842  -
 Ҫakmaktepe 
- Oxide
Indicated 2,028 1.93 9.87  - 126 643  -
Indicated- Oxide Stockpile  11 2.69  -  - - -
Indicated 2,039 1.93 9.82  - 127 643  -
Inferred 1,681 0.88 6.42  - 47  347 -
 Bayramdere 
- Oxide
Indicated 145 2.34 20.82 - 11 97 -
Inferred 8 2.17 19.95 - 1 5 -
Ҫӧpler - Total Indicated  81,994  1.97  5.03
-
 5,189 13,263 33,435
Inferred  32,980  1.29  8.88 -  1,365 9,414 57,341
Alacer Gold - Total Indicated  97,849  1.91  4.22  -  6,006 13,263  33,435
Inferred  41,799  1.46  7.01  -  1,959  9,414 57,341

Notes: Further information on this Mineral Resource estimate is in the Çöpler Mine Technical Report, dated June 9, 2016; the Çakmaktepe press release, dated December 18, 2017 ("Çakmaktepe Update");and the Ardich press release dated November 22, 2019 ("Ardich Update") can all be found on our website, www.AlacerGold.com, www.sedar.com and on www.asx.com.au. Mineral Resources are quoted after mining depletion through December 31, 2019 and are inclusive of Mineral Reserves. Mineral Resources are shown on a 100% basis. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Çöpler Mine Technical Report, the Çakmaktepe Update, and the Ardich Update.  The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences may occur.

Market Data copyright © 2019 QuoteMedia. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges). RT=Real-Time, EOD=End of Day, PD=Previous Day. Market Data powered by QuoteMedia. Terms of Use.