Alacer Gold - Proven and Probable Mineral Reserve Summary (As of March 31, 2019)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -    -   -   -   - 
Probable  6,253  1.10  6.18  0.11  -    222  1,242 15,685  - 
Probable - Oxide Stockpile  121  0.58  -    -    -    2  -   -   - 
Proven + Probable  6,374  1.09  6.06  0.11  -    224  1,242 15,685  - 
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -    -   -   -   - 
Probable  28,905  2.60 6.65  -    -    2,418  6,180  -   - 
Probable - Sulfide Stockpile  8,272  3.20  -    -    -    850  -   -   - 
Proven + Probable  37,177  2.73  5.17  -    -    3,268 6,180  -   - 
 Çakmaktepe
- Oxide
Proven  - 
 -    -    -    -    -    -    -    -  
Probable 2,468 2.18 14.47  -    -   173 1,148  -    -  
Probable - Oxide Stockpile 81 1.13  -    -    -    -    -    -  
Proven + Probable 2,549 2.15 14.01  -    -   176 1,148  -    -  
Ҫӧpler Project Total Proven  -   -    -    -    -    -   -   -   - 
Probable 46,100  2.47  5.78  0.02  -    3,667 8,570 15,685  - 
Proven + Probable 46,100  2.47  5.78  0.02  -     3,667 8,570 15,685  - 
Gediktepe - Oxide Proven  -    -     -    -    -    -    -    -   - 
Probable  2,755   2.34  56.68  -    -    207  5,020  -   - 
Proven + Probable  2,755   2.34   56.68  -    -    207  5,020  -   - 
Gediktepe - Sulfide Proven  3,620  0.68  26.68  1.03  1.93  79  3,105  82,380  154,112
Probable  14,960  0.89  33.06  0.89  1.99  429  15,903  293,128  657,768
Proven + Probable  18,580  0.85  31.82  0.92  1.98  509  19,008  375,508  811,880
Gediktepe - Total Proven  3,620  0.68  26.68  1.03  1.93  79  3,105  82,380  154,112
Probable  17,715  1.12  36.74  0.75  1.68  636  20,923 293,128  657,768
Proven + Probable  21,335  1.04  35.03  0.80  1.73  716  24,028  375,508  811,880
Alacer Gold - Total Proven  3,620  0.68  26.68  1.03  1.93  79  3,105  82,380  154,112
Probable  63,815  2.10  14.38  0.22  0.47  4,304  29,494  308,813  657,768
Proven + Probable  67,435  2.02  15.04  0.26  0.55  4,383  32,599  391,193  811,880


Notes: Further information on this reserve estimate is in the Updated Technical Report and the Gediktepe PFS both of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. The Mineral Reserve methodology and cut-off grades are discussed in the Updated Technical Report and the Gediktepe PFS. Mineral Reserves are shown on a 100% basis, Alacer owns 80% of Çöpler and 50% of Ҫakmaktepe and Gediktepe. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Updated Technical Report and the Gediktepe PFS. Work related to the Gediktepe feasibility study continues and the Corporation intends to publish an updated PFS in Q1 2019. Other than this work, the Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.


Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of March 31, 2019)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ardich - Oxide Measured  -
Indicated 11,205 1.29  -  -  - 465  -  -  -
Measured +
Indicated
11,205 1.29 - - - 465  - - -
Inferred 2,077 0.88 - - - 59 - - -
Ardich - Sulfide Measured - - - - - - - - -
Indicated 2,038 2.66 - - - 174 - - -
Measured +
Indicated
2,038 2.66 - - - 174 - - -
Inferred 501 2.33 - - - 38 - - -
Ardich Project Total Measured  - - - - - - -  - -
Indicated 13,243 1.50 - - - 639 - - -
Measured + Indicated 13,243 1.50 - - - 639 - -  -
Inferred 2,578 1.16 - - - 96 - - -
Ҫӧpler Mine - Oxide Measured - - - - - - - - -
Indicated  12,935 0.97  4.25  0.13  -  402 1,766 35,802 -
Indicated - Oxide Stockpile 121  0.58 - - -  2  - - -
Measured + Indicated 13,056  0.96  4.21  0.12  -   404 1,766 35,802  -
Inferred  18,976  0.86  6.99  0.14  -  522  4,265 58,562  -
Ҫӧpler Mine - Sulfide Measured - - - - - - - - -
Indicated  61,162  2.10  5.54 - -  4,124 10,894 - -
Indicated - Sulfide Stockpile  8,272  3.20 - - -  850 - - -
Measured + Indicated  69,435  2.23  4.88 - -  4,974 10,894  -  -
Inferred  12,716  1.99  12.02  -  -  814 4,913  -  -
 Ҫakmaktepe 
- Oxide
Measured - - - - - - - - -
Indicated 3,749 1.87 12.37  -  - 226 1,491  -  -
Indicated- Oxide Stockpile  81 1.13  -  - - - - -
Measured + Indicated 3,830 1.86 12.11  -  - 229 1,491  -  -
Inferred 1,435 1.05 8.03  -  - 49  370 - -
 Bayramdere 
- Oxide
Measured - - - - - - - - -
Indicated 145 2.34 20.82 - - 11 97 - -
Measured + Indicated 145 2.34 20.82 - - 11 97 - -
Inferred 8 2.17 19.95 - - 1 5 - -
Ҫӧpler Project - Total Measured - - - - - - - - -
Indicated  86,465  2.02  5.13  0.02 -  5,617 14,248 35,802 -
Measured + Indicated  86,465  2.03  5.13  0.02 -  5,651 14,248 35,802 -
Inferred  33,136  1.30  8.97  0.08 -  1,385 9,554 58,562 -
Gediktepe - Oxide Measured -  - - - - - - - -
Indicated  2,674  2.71  66.34 0.10 0.10 233 5,703 6,082 5,923
Measured + Indicated 2,674  2.71  66.34 0.10 0.10  233 5,703 6,082 5,923
Inferred  23  0.95  21.75 0.23  0.14 1 16 113 69
Gediktepe - Sulfide Measured 3,999  0.67  25.06  1.01  1.83 86 3,221 88,684  161,187
Indicated  23,544  0.74  27.56  0.85  1.69  560  20,865 441,934  879,595
Measured + Indicated  27,542  0.73   27.20  0.87  1.71  645  24,086  530,618  1,040,782
Inferred 2,958  0.53  20.25  0.76  1.16  51  1,926  4,956 7,584
Gediktepe - Total Measured  3,999  0.67  25.06  1.01  1.83  86  3,221 88,684 161,187
Indicated  26,217  0.94  31.52  0.78  1.53  792  26,568  448,016 885,518
Measured + Indicated  30,216  0.90   30.66  0.81   1.57  878  29,790 536,700  1,046,705
Inferred 2,981  0.54  20.26  0.76  1.16  51  1,941 5,070  7,654
Alacer Gold - Total Measured  3,999  0.67  25.06  1.01  1.83  86 3,221 88,684 161,187
Indicated  125,926  1.74  10.08  0.17  0.32  7,048 40,817  483,818  885,518
Measured + Indicated  129,924  1.71  10.54  0.20  0.37  7,134 44,038 572,502  1,046,705
Inferred  38,695  1.23  9.24  0.13  0.09   1,533  11,495 63,631 7,654




Notes: Further information on this resource estimate is in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS all of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. Mineral Resources are quoted after mining depletion and are inclusive of Mineral Reserves. Mineral Resources are shown on a 100% basis, Alacer owns 80% of Çöpler, 50% of Gediktepe, and either 50% or 80% of Ҫakmaktepe. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS. Work related to the Gediktepe feasibility study continues and the Corporation intends to publish an updated PFS in Q1 2019. Other than this work, the Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.