Operations
Resources and Reserves
Alacer Gold - Proven and Probable Mineral Reserve Summary (As of March 31, 2019)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -   -   - 
Probable  6,253  1.10  6.18  0.11  222  1,242 15,685
Probable - Oxide Stockpile  121  0.58  -    -    2  -   - 
Proven + Probable  6,374  1.09  6.06  0.11  224  1,242 15,685
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -   -   - 
Probable  28,905  2.60 6.65  -    2,418  6,180  - 
Probable - Sulfide Stockpile  8,272  3.20  -    -    850  -   - 
Proven + Probable  37,177  2.73  5.17  -    3,268 6,180  - 
 Çakmaktepe
- Oxide
Proven  - 
 -    -    -    -    -    -  
Probable 2,468 2.18 14.47  -   173 1,148  -  
Probable - Oxide Stockpile 81 1.13  -    -    -    -  
Proven + Probable 2,549 2.15 14.01  -   176 1,148  -  
Ҫӧpler Project Total Proven  -   -    -    -    -   -   - 
Probable 46,100  2.47  5.78  0.02  3,667 8,570 15,685
Proven + Probable 46,100  2.47  5.78  0.02   3,667 8,570 15,685

Notes: Further information on this reserve estimate is in the Updated Technical Report and the Gediktepe PFS both of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. The Mineral Reserve methodology and cut-off grades are discussed in the Updated Technical Report and the Gediktepe PFS. Mineral Reserves are shown on a 100% basis, Alacer owns 80% of Çöpler and 50% of Ҫakmaktepe and Gediktepe. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Updated Technical Report and the Gediktepe PFS. Work related to the Gediktepe feasibility study continues and the Corporation intends to publish an updated PFS in Q1 2019. Other than this work, the Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.


Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of March 31, 2019)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000)
Ardich - Oxide Measured  -
Indicated 11,205 1.29  -  - 465  -  -
Measured +
Indicated
11,205 1.29 - - 465 - -
Inferred 2,077 0.88 - - 59 - -
Ardich - Sulfide Measured - - - - - - -
Indicated 2,038 2.66 - - 174 - -
Measured +
Indicated
2,038 2.66 - - 174 - -
Inferred 501 2.33 - - 38 - -
Ardich Project Total Measured  - - - - - -  -
Indicated 13,243 1.50 - - 639 - -
Measured + Indicated 13,243 1.50 - - 639 - -
Inferred 2,578 1.16 - - 96 - -
Ҫӧpler Mine - Oxide Measured - - - - - - -
Indicated  12,935 0.97  4.25  0.13   402 1,766 35,802
Indicated - Oxide Stockpile 121  0.58 - -  2  - -
Measured + Indicated 13,056  0.96  4.21  0.12  404 1,766 35,802
Inferred  18,976  0.86  6.99  0.14  522  4,265 58,562
Ҫӧpler Mine - Sulfide Measured - - - - - - -
Indicated  61,162  2.10  5.54 -  4,124 10,894 -
Indicated - Sulfide Stockpile  8,272  3.20 - -  850 - -
Measured + Indicated  69,435  2.23  4.88 -  5,007 10,894  -
Inferred  12,716  1.99  12.02  -  814 4,913  -
 Ҫakmaktepe 
- Oxide
Measured - - - - - - -
Indicated 3,749 1.87 12.37  - 226 1,491  -
Indicated- Oxide Stockpile  81 1.13  -  - - -
Measured + Indicated 3,830 1.86 12.11  - 229 1,491  -
Inferred 1,435 1.05 8.03  - 49  370 -
 Bayramdere 
- Oxide
Measured - - - - - - -
Indicated 145 2.34 20.82 - 11 97 -
Measured + Indicated 145 2.34 20.82 - 11 97 -
Inferred 8 2.17 19.95 - 1 5 -
Ҫӧpler Project - Total Measured - - - - - - -
Indicated  86,465  2.02  5.13  0.02  5,617 14,248 35,802
Measured + Indicated  86,465  2.03  5.13  0.02  5,651 14,248 35,802
Inferred  33,136  1.30  8.97  0.08  1,385 9,554 58,562
Alacer Gold - Total Measured - - - - - - -
Indicated  99,708  1.95  4.44  0.02  6,256 14,248  35,802
Measured + Indicated  99,708  1.95  4.44  0.02  6,256 14,248 35,802
Inferred  35,713  1.29  8.32  0.07  1,481  9,554 58,562

Notes: Further information on this resource estimate is in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS all of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. Mineral Resources are quoted after mining depletion and are inclusive of Mineral Reserves. Mineral Resources are shown on a 100% basis, Alacer owns 80% of Çöpler, 50% of Gediktepe, and either 50% or 80% of Ҫakmaktepe. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS. Work related to the Gediktepe feasibility study continues and the Corporation intends to publish an updated PFS in Q1 2019. Other than this work, the Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.

Market Data copyright © 2019 QuoteMedia. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges). RT=Real-Time, EOD=End of Day, PD=Previous Day. Market Data powered by QuoteMedia. Terms of Use.