Alacer Gold - Proven and Probable Mineral Reserve Summary (As of December 31, 2016)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -    -   -   -   - 
Probable  14,298  1.11  4.04  0.11  -    512  -   -   - 
Probable - Oxide Stockpile  7  0.84  -    -    -    0  -   -   - 
Proven + Probable  14,305  1.11  4.04  0.11  -    512  -   -   - 
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -    -   -   -   - 
Probable  32,530  2.63  7.35  -    -    2,754  -   -   - 
Probable - Sulfide Stockpile  7,071  3.38  -    -    -    767  -   -   - 
Proven + Probable  39,601  2.77  6.04  -    -    3,522  -   -   - 
Ҫӧpler Mine Total Proven  -   -    -    -    -    -   -   -   - 
Probable  53,905  2.33  5.51  0.03  -    4,034  -   -   - 
Proven + Probable  53,905  2.33  5.51  0.03  -    4,034  -   -   - 
Gediktepe - Oxide Proven  1,456  2.98  74.70  -    -    139  3,497  -   - 
Probable  1,767  2.93  80.30  -    -    166  4,562  -   - 
Proven + Probable  3,223  2.95  77.70  -    -    306  8,051  -   - 
Gediktepe - Sulfide Proven  10,425  0.84  31.00  1.04  2.05  282  10,390  239,025  471,155
Probable  11,267  1.00  39.30  0.93  2.63  362  14,236  231,007  653,278
Proven + Probable  21,692  0.93  35.30  0.99  2.35  649  24,619  473,444  1,123,832
Gediktepe - Total Proven  11,881  1.11  36.30  0.93  1.82  424  13,866  243,596  476,714
Probable  13,034  1.26  44.90  0.83  2.32  528  18,815  238,501  666,652
Proven + Probable  24,915  1.19  40.80  0.88  2.08  953  32,682  483,367  1,142,505
Alacer Gold - Total Proven  11,881  1.11  36.30  0.93  1.82  424  13,866  243,596  476,714
Probable  66,939  2.12  13.18  0.19  0.45  4,562  18,815  238,501  666,652
Proven + Probable  78,820  1.97  16.66  0.30  0.66  4,987  32,682  483,367  1,142,505

Notes: Further information on this reserve estimate is in the Updated Technical Report and the Gediktepe PFS both of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. The Mineral Reserve methodology and cut-off grades are discussed in the Updated Technical Report and the Gediktepe PFS. Mineral Reserves are shown on a 100% basis. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Updated Technical Report and the Gediktepe PFS. The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.

Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of December 31, 2016)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ҫӧpler Mine - Oxide Measured  -   -    -    -    -    -   -   -   - 
Indicated  21,289  1.02  3.49  0.12  -    696  -   -   - 
Indicated - Oxide Stockpile  7  0.84  -    -    -    0  -   -   - 
Measured + Indicated  21,296  1.02  3.49  0.12  -    697  -   -   - 
Inferred  19,800  0.84  6.72  0.14  -    537  -   -   - 
Ҫӧpler Mine - Sulfide Measured  -   -    -    -    -    -   -   -   - 
Indicated  66,644  2.12  6.00  -    -    4,536  -   -   - 
Indicated - Sulfide Stockpile  7,071  3.38  -    -    -    767  -   -   - 
Measured + Indicated  73,714  2.24  5.42  -    -    5,303  -   -   - 
Inferred  12,716  1.99  12.02  -    -    814  -   -   - 
Ҫӧpler Mine - Total Measured  -   -    -    -    -    -   -   -   - 
Indicated  95,010  1.96  4.99  0.03  -    6,000  -   -   - 
Measured + Indicated  95,010  1.96  4.99  0.03  -    6,000  -   -   - 
Inferred  32,516  1.29  8.79  0.08  -    1,350  -   -   - 
Ҫakmaktepe - Oxide Measured  -   -    -    -    -    -  -  -  -
Indicated  2,278  1.76  10.94  -    -    129,000  -  -  -
Measured + Indicated  2,278  1.76  10.94  -    -    129,000  -  -  -
Inferred  373  1.89  0.92  -    -    23,000  -  -  -
Bayramdere - Oxide Measured  -   -    -    -    -    -  -  -  -
Indicated  145  2.34  20.82  -    -    11,000  -  -  -
Measured + Indicated  145  2.34  20.82  -    -    11,000  -  -  -
Inferred  8  2.17  19.95  -    -    1,000  -  -  -
Ҫӧpler District Total Measured  -   -    -    -    -    -   -   -   - 
Indicated  2,422  1.80  11.53  -    -    140  -   -   - 
Measured + Indicated  2,422  1.80  11.53  -    -    140  -   -   - 
Inferred  381  1.89  1.35  -    -    24  -   -   - 
Gediktepe - Oxide Measured  1,722  2.65  66.50  -    -    146  3,690  -   - 
Indicated  2,110  2.56  71.00  -    -    174  4,817  -   - 
Measured + Indicated  3,832  2.60  69.00  -    -    320  8,497  -   - 
Inferred  213  1.57  63.10  -    -    11  432  -   - 
Gediktepe - Sulfide Measured  12,027  0.78  28.50  1.00  1.89  300  11,030  263,824  501,133
Indicated  20,180  0.77  30.10  0.85  1.95  502  19,506  378,158  867,540
Measured + Indicated  32,207  0.77  29.50  0.90  1.93  802  30,536  641,982  1,368,673
Inferred  1,685  0.81  31.70  0.98  1.80  44  1,719  36,256  66,866
Gediktepe - Total Measured  13,749  1.01  33.30  0.89  1.67  447  14,710  263,824  501,133
Indicated  22,290  0.94  33.90  0.79  1.80  675  24,323  378,158  867,540
Measured + Indicated  36,039  0.97  33.70  0.82  1.75  1,122  39,033  641,982  1,368,673
Inferred  1,898  0.89  35.30  0.88  1.62  55  2,151  36,256  66,866
Alacer Gold - Total Measured  13,749  1.01  33.30  0.89  1.67  447  14,710  263,824  501,133
Indicated  133,475  1.59  9.42  0.15  0.30  6,815  24,323  378,158  867,540
Measured + Indicated  133,471  1.69  12.86  0.24  0.47  7,262  39,033  641,982  1,368,673
Inferred  34,795  1.28  10.16  0.13  0.09  1,429  2,151  36,256  66,866

Notes: Further information on this resource estimate is in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS all of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. Mineral Resources are quoted after mining depletion and are inclusive of Mineral Reserves. Mineral Resources are shown on a 100% basis. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS. The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.

The Cevizlidere Inferred Resource totals 445.7 million tonnes at 0.11g/t gold, 0.38% copper, and 48ppm molybdenum, containing 1.6 million ounces gold and 3,734 million pounds of copper. Further information on this resource is available in the “Technical Report on the Cevizlidere Porphyry Deposit, Tunceli Province, Turkey”.

The Karakartal Indicated Resource totals 13.8 million tonnes 0.46g/t gold and 0.29% copper and the Karakartal Inferred Resource totals 17.8 million tonnes at 0.32g/t gold and 0.22% copper. Further information on this resource is available in the “Preliminary Estimate of Mineral Resources Karakartal Project, East Central Turkey”.

All of the above Mineral Resources and Reserves are on a 100% basis. Alacer owns 80% of Çöpler, 50% of Cevizlidere and 50% of Karakartal.