Alacer Gold - Proven and Probable Mineral Reserve Summary (As of December 31, 2017)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -    -   -   -   - 
Probable  8,219  1.09  4.94  0.11  -    288  1,305 19,180  - 
Probable - Oxide Stockpile  92  0.67  -    -    -    2  -   -   - 
Proven + Probable  8,311  1.08  4.88  0.10  -    290  1,305 19,180  - 
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -    -   -   -   - 
Probable  30,351  2.60 6.66  -    -    2,539  6,494  -   - 
Probable - Sulfide Stockpile  8,758  3.42  -    -    -    963  -   -   - 
Proven + Probable  39,110  2.79  5.16  -    -    3,502 6,494  -   - 
 Çakmaktepe
- Oxide
Proven  - 
 -    -    -    -    -    -    -    -  
Probable 2,527  2.16 14.20  -    -   176 1,154  -    -  
Proven + Probable 2,527  2.16 14.20  -    -   176 1,154  -    -  
Ҫӧpler Project Total Proven  -   -    -    -    -    -   -   -   - 
Probable 49,948  2.47  5.58  0.02  -    3,968 8,953 19,180  - 
Proven + Probable 49,948  2.47  5.58  0.02  -     3,968 8,953 19,180  - 
Gediktepe - Oxide Proven  1,456  2.98  74.70  -    -    139  3,497  -   - 
Probable  1,767  2.93  80.30  -    -    166  4,562  -   - 
Proven + Probable  3,223  2.95  77.77  -    -    306  8,059  -   - 
Gediktepe - Sulfide Proven  10,425  0.84  31.00  1.04  2.05  282  10,390  239,025  471,155
Probable  11,267  1.00  39.30  0.93  2.63  362  14,236  231,007  653,278
Proven + Probable  21,692  0.92  35.31  0.98  2.35  644  24,626  470,032  1,124,432
Gediktepe - Total Proven  11,881  1.10  36.36  0.91  1.80  421  13,887  239,025  471,155
Probable  13,034  1.26  44.86  0.80  2.27  529  18,798 231,007  653,278
Proven + Probable  24,915  1.19  40.80  0.86  2.05  950  32,685  470,032  1,124,432
Alacer Gold - Total Proven  11,881  1.10  36.36  0.91  1.80  421  13,887  239,025  471,155
Probable  62,982  2.22  13.70  0.18  0.47  4,497  27,751  250,187  653,278
Proven + Probable  74,863  2.04  17.30  0.30  0.68  4,918  41,638  489,212  1,124,432

Notes: Further information on this reserve estimate is in the Updated Technical Report and the Gediktepe PFS both of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. The Mineral Reserve methodology and cut-off grades are discussed in the Updated Technical Report and the Gediktepe PFS. Mineral Reserves are shown on a 100% basis, Alacer owns 80% of Çöpler and 50% of Ҫakmaktepe and Gediktepe. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Updated Technical Report and the Gediktepe PFS. The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.

Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of December 31, 2017)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ҫӧpler Mine - Oxide Measured  -   -    -    -    -    -   -   -   - 
Indicated  14,971 0.97  3.80  0.12  -    469 1,830 39,325  - 
Indicated - Oxide Stockpile 92  0.67  -    -    -    2  -   -   - 
Measured + Indicated 15,064  0.97  3.78  0.12  -    471 1,830 39,325   - 
Inferred  19,532  0.85  6.80  0.14  -    532  4,271 58,869   - 
Ҫӧpler Mine - Sulfide Measured  -   -    -    -    -    -   -   -   - 
Indicated  63,543  2.10  5.60  -    -    4,282 11,432   -   - 
Indicated - Sulfide Stockpile  8,758  3.42  -    -    -    963  -   -   - 
Measured + Indicated  72,301  2.26  4.92  -    -    5,245 11,432  -   - 
Inferred  12,716  1.99  12.02  -    -    814 4,913  -   - 
 Ҫakmaktepe 
- Oxide
 Measured  -    -    -    -    -    -    -    -    -  
 Indicated 3,820 1.86 12.19  -    -   229 1,498  -    -  
 Measured
 + Indicated
3,820 1.86 12.19  -    -   229 1,498  -    -  
 Inferred 1,455 1.05 7.94  -    -   49  372   -     - 
 Bayramdere 
- Oxide
 Measured  -    -    -    -    -    -    -    -    -  
 Indicated 145 2.34 20.82  -    -   11 97  -    -  
 Measured
 + Indicated
145 2.34 20.82  -    -   11 97  -    -  
 Inferred 8 2.17 19.95  -    -   1 5  -    -  
Ҫӧpler Project - Total Measured  -   -    -    -    -    -   -   -   - 
Indicated  91,330  2.03  5.06  0.02  -    5,955 14,856 39,325  - 
Measured + Indicated  91,330  2.03  5.06  0.02  -    5,955 14,856 39,325  - 
Inferred  33,712  1.29  8.82  0.08  -    1,395 9,560 58,869  - 
Gediktepe - Oxide Measured  1,722  2.65  66.50  -    -    146  3,690  -   - 
Indicated  2,110  2.56  71.00  -    -    174  4,817  -   - 
Measured + Indicated  3,832  2.60  69.00  -    -    320  8,497  -   - 
Inferred  213  1.57  63.10  -    -    11  432  -   - 
Gediktepe - Sulfide Measured  12,027  0.78  28.50  1.00  1.89  300  11,030  263,824  501,133
Indicated  20,180  0.77  30.10  0.85  1.95  502  19,506  378,158  867,540
Measured + Indicated  32,207  0.77  29.50  0.90  1.93  802  30,536  641,982  1,368,673
Inferred  1,685  0.81  31.70  0.98  1.80  44  1,719  36,256  66,866
Gediktepe - Total Measured  13,749  1.01  33.30  0.89  1.67  447  14,710  263,824  501,133
Indicated  22,290  0.94  33.90  0.79  1.80  675  24,323  378,158  867,540
Measured + Indicated  36,039  0.97  33.70  0.82  1.75  1,122  39,033  641,982  1,368,673
Inferred  1,898  0.89  35.30  0.88  1.62  55  2,151  36,256  66,866
Alacer Gold - Total Measured  13,749  1.01  33.30  0.89  1.67  447  14,710  263,824  501,133
Indicated  113,620  1.81  10.72  0.17  0.35  6,630  39,179  417,483  867,540
Measured + Indicated  127,369  1.73  13.16  0.25  0.50  7,077  53,889  681,307  1,368,673
Inferred  35,610  1.27  10.23  0.12  0.09  1,450  11,711  95,125  66,866

Notes: Further information on this resource estimate is in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS all of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. Mineral Resources are quoted after mining depletion and are inclusive of Mineral Reserves. Mineral Resources are shown on a 100% basis, Alacer owns 80% of Çöpler, 50% of Gediktepe, and either 50% or 80% of Ҫakmaktepe. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS. The Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.

Market Data copyright © 2017 QuoteMedia. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges). RT=Real-Time, EOD=End of Day, PD=Previous Day. Market Data powered by QuoteMedia. Terms of Use.