Operations
Resources and Reserves
Alacer Gold - Proven and Probable Mineral Reserve Summary (As of December 31, 2018)
Deposit Reserve Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ҫӧpler Mine - Oxide Proven  -   -    -    -    -    -   -   -   - 
Probable  6,253  1.10  6.18  0.11  -    222  1,242 15,685  - 
Probable - Oxide Stockpile  121  0.58  -    -    -    2  -   -   - 
Proven + Probable  6,374  1.09  6.06  0.11  -    224  1,242 15,685  - 
Ҫӧpler Mine - Sulfide Proven  -   -    -    -    -    -   -   -   - 
Probable  28,905  2.60 6.65  -    -    2,418  6,180  -   - 
Probable - Sulfide Stockpile  8,272  3.20  -    -    -    850  -   -   - 
Proven + Probable  37,177  2.73  5.17  -    -    3,268 6,180  -   - 
 Çakmaktepe
- Oxide
Proven  - 
 -    -    -    -    -    -    -    -  
Probable 2,468 2.18 14.47  -    -   173 1,148  -    -  
Probable - Oxide Stockpile 81 1.13  -    -    -    -    -    -  
Proven + Probable 2,549 2.15 14.01  -    -   176 1,148  -    -  
Ҫӧpler Project Total Proven  -   -    -    -    -    -   -   -   - 
Probable 46,100  2.47  5.78  0.02  -    3,667 8,570 15,685  - 
Proven + Probable 46,100  2.47  5.78  0.02  -     3,667 8,570 15,685  - 
Gediktepe - Oxide Proven  1,456  2.98  74.70  -    -    139  3,497  -   - 
Probable  1,767  2.93  80.30  -    -    166  4,562  -   - 
Proven + Probable  3,223  2.95  77.77  -    -    306  8,059  -   - 
Gediktepe - Sulfide Proven  10,425  0.84  31.00  1.04  2.05  282  10,390  239,025  471,155
Probable  11,267  1.00  39.30  0.93  2.63  362  14,236  231,007  653,278
Proven + Probable  21,692  0.92  35.31  0.98  2.35  644  24,626  470,032  1,124,432
Gediktepe - Total Proven  11,881  1.10  36.36  0.91  1.80  421  13,887  239,025  471,155
Probable  13,034  1.26  44.86  0.80  2.27  529  18,798 231,007  653,278
Proven + Probable  24,915  1.19  40.80  0.86  2.05  950  32,685  470,032  1,124,432
Alacer Gold - Total Proven  11,881  1.10  36.36  0.91  1.80  421  13,887  239,025  471,155
Probable  59,134  2.21   14.40  0.19  0.50  4,196  27,368  246,692  653,278
Proven + Probable  71,015  2.02  18.07  0.31   0.72  4,617  41,256  485,717  1,124,432

Notes: Further information on this reserve estimate is in the Updated Technical Report and the Gediktepe PFS both of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. The Mineral Reserve methodology and cut-off grades are discussed in the Updated Technical Report and the Gediktepe PFS. Mineral Reserves are shown on a 100% basis, Alacer owns 80% of Çöpler and 50% of Ҫakmaktepe and Gediktepe. The key assumptions, parameters, and methods used to estimate the Mineral Reserves are provided in the Updated Technical Report and the Gediktepe PFS. Work related to the Gediktepe feasibility study continues and the Corporation intends to publish an updated PFS in Q1 2019. Other than this work, the Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.


Alacer Gold - Measured, Indicated, and Inferred Mineral Resource Summary (As of December 31, 2018)
Deposit Resource Category Material Tonnes (x1000) Au (g/t) Ag (g/t) Cu (%) Zn (%) Contained Au (oz x 1000) Contained Ag (oz x 1000) Contained Cu (lb x 1000) Contained Zn (lb x 1000)
Ardich Project Total Measured  -     -     -     -     -     -     -     -     - 
Indicated 6,928  1.32  -     -     -    294  -     -     - 
Measured + Indicated 6,928 1.32  -     -     -    294  -    -     - 
Inferred 2,213 1.20  -     -     -    85  -   -   - 
Ҫӧpler Mine - Oxide Measured  -   -    -    -    -    -   -   -   - 
Indicated  12,935 0.97  4.25  0.13   -    402 1,766 35,802  - 
Indicated - Oxide Stockpile 121  0.58  -    -    -    2  -   -   - 
Measured + Indicated 13,056  0.96  4.21  0.12  -    404 1,766 35,802  - 
Inferred  18,976  0.86  6.99  0.14  -    522  4,265 58,562  - 
Ҫӧpler Mine - Sulfide Measured  -   -    -    -    -    -   -   -   - 
Indicated  61,162  2.10  5.54  -    -    4,124 10,894  -   - 
Indicated - Sulfide Stockpile  8,272  3.20  -    -    -    850  -   -   - 
Measured + Indicated  69,435  2.23  4.88  -    -    4,974 10,894  -   - 
Inferred  12,716  1.99  12.02  -    -    814 4,913  -   - 
 Ҫakmaktepe 
- Oxide
Measured  -    -    -    -    -    -    -    -    -  
Indicated 3,789 1.87 12.37  -    -   226 1,491  -    -  
Indicated- Oxide Stockpile  81 1.13  -     -     -     -     -     -   
Measured
 + Indicated
3,830 1.86 12.11  -    -   229 1,491  -    -  
Inferred 1,435 1.05 8.03  -    -   49  370  -     - 
 Bayramdere 
- Oxide
Measured  -    -    -    -    -    -    -    -    -  
Indicated 145 2.34 20.82  -    -   11 97  -    -  
Measured
 + Indicated
145 2.34 20.82  -    -   11 97  -    -  
Inferred 8 2.17 19.95  -    -   1 5  -    -  
Ҫӧpler Project - Total Measured  -   -    -    -    -    -   -   -   - 
Indicated  86,465  2.02  5.13  0.02  -    5,617 14,248 35,802  - 
Measured + Indicated  86,465  2.02  5.13  0.02  -    5,617 14,248 35,802  - 
Inferred  33,136  1.30  8.97  0.08  -    1,385 9,554 58,562  - 
Gediktepe - Oxide Measured  1,722  2.65  66.50  -    -    146  3,690  -   - 
Indicated  2,110  2.56  71.00  -    -    174  4,817  -   - 
Measured + Indicated  3,832  2.60  69.00  -    -    320  8,497  -   - 
Inferred  213  1.57  63.10  -    -    11  432  -   - 
Gediktepe - Sulfide Measured  12,027  0.78  28.50  1.00  1.89  300  11,030  263,824  501,133
Indicated  20,180  0.77  30.10  0.85  1.95  502  19,506  378,158  867,540
Measured + Indicated  32,207  0.77  29.50  0.90  1.93  802  30,536  641,982  1,368,673
Inferred  1,685  0.81  31.70  0.98  1.80  44  1,719  36,256  66,866
Gediktepe - Total Measured  13,749  1.01  33.30  0.89  1.67  447  14,710  263,824  501,133
Indicated  22,290  0.94  33.90  0.79  1.80  675  24,323  378,158  867,540
Measured + Indicated  36,039  0.97  33.70  0.82  1.75  1,122  39,033  641,982  1,368,673
Inferred  1,898  0.89  35.30  0.88  1.62  55  2,151  36,256  66,866
Alacer Gold - Total Measured  13,749  1.01  33.30  0.89  1.67  447  14,710  263,824  501,133
Indicated  115,683  1.77  10.36  0.17  0.35  6,587  38,571  413,960  867,540
Measured + Indicated  129,432  1.69  12.80  0.24  0.49  7,034  53,281  677,784  1,368,673
Inferred  37,247  1.27  9.78  0.12  0.08   1,525  11,705  94,818  66,866

Notes: Further information on this resource estimate is in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS all of which can be found on the Corporation’s website at www.alacergold.com, on www.sedar.com, and on www.asx.com.au. Mineral Resources are quoted after mining depletion and are inclusive of Mineral Reserves. Mineral Resources are shown on a 100% basis, Alacer owns 80% of Çöpler, 50% of Gediktepe, and either 50% or 80% of Ҫakmaktepe. The key assumptions, parameters, and methods used to estimate the Mineral Resources are provided in the Updated Technical Report, Çöpler District Resource Release and the Gediktepe PFS. Work related to the Gediktepe feasibility study continues and the Corporation intends to publish an updated PFS in Q1 2019. Other than this work, the Corporation is not aware of any new information or data that materially affects the information included in these tables and that all material assumptions and technical parameters underpinning the estimates in these tables continue to apply and have not materially changed. Rounding differences will occur.

Market Data copyright © 2019 QuoteMedia. Data delayed 15 minutes unless otherwise indicated (view delay times for all exchanges). RT=Real-Time, EOD=End of Day, PD=Previous Day. Market Data powered by QuoteMedia. Terms of Use.